Epoxy Flooring Installation in Oak Ridge, TN

Knoxville Epoxy Floor Pros installs commercial epoxy flooring, industrial floor coatings and garage floor coatings in Oak Ridge, TN, and every commercial job is led by an installer with OSHA 30 training. More than 140 Anderson County floors have been coated so far, from 1950s homes off Tulane Avenue to busy shops along the Oak Ridge Turnpike. Each quote is free, written and broken down line by line before any work is booked.

RECENT LOCAL PROJECTS

Recent Epoxy Floor Projects in Oak Ridge, TN

Three recent Oak Ridge jobs, from a family garage to a working machine shop, each with the floor size, turnaround and final price.

01

Flake Epoxy Garage Floor installed on Tulane Ave, Oak Ridge, TN 37830

This 1950s house off Tulane Avenue had a narrow garage with decades of oil stains and a patched slab that never matched. The crew ground out the old patches, rebuilt two spalled spots at the door and broadcast a black, gray and white flake. A clear polyaspartic topcoat finished the job, and the owner parked inside again after 48 hours. The new floor also brightened the narrow space enough that a workbench now fits along one wall.

Turnaround: 2 days

Price: $2,750 (440 sq ft)

02

Quartz Epoxy Basement Floor installed on Emory Valley Rd, Oak Ridge, TN 37830

A split-level home on Emory Valley Road had a lower-level slab that felt cold and stayed slightly damp near the back wall. After a moisture test, a vapor-blocking primer went down, then a sandy beige quartz epoxy with a satin topcoat. The room is now a teen hangout with a sectional and a ping pong table, and the musty smell is gone. The owners chose quartz over flake because it feels smoother under bare feet.

Turnaround: 3 days

Price: $4,450 (600 sq ft)

03

Industrial Epoxy Floor installed at a machine shop on Warehouse Rd, Oak Ridge, TN 37830

A machine shop on Warehouse Road had cutting oil soaked into bare concrete and forklift ruts near the loading door. Knoxville Epoxy Floor Pros shot-blasted the slab, filled the ruts with epoxy mortar and laid a gray 20-mil industrial epoxy with yellow aisle lines. The work ran in sections over three weekends, so production never stopped for a single shift. The shop foreman says cleanup at the end of each shift now takes half the time.

Turnaround: 6 days over 3 weekends

Price: $14,400 (2,400 sq ft)

WHAT WE OFFER

Epoxy Floor Coating Services Across Oak Ridge

01

Garage Floor Coatings

Older Oak Ridge garages often have thin, patched slabs that need extra prep before any coating goes on. A full grind, crack repair and flake broadcast give them a durable finish that hides dust and wipes clean in minutes. Newer homes in Rarity Ridge usually get the same system in one day with a polyaspartic topcoat. Flake blends can also be matched to cabinets, trim or siding. Most garage jobs here wrap up in 1 to 2 days.

02

Basement Floor Coatings

Homes near Melton Hill Lake and along the Clinch River can hold high humidity below grade for much of the year. Every basement gets a moisture test, a vapor-blocking primer when readings run high and a solid color, quartz or metallic finish that turns cold concrete into a room the family actually uses. Window wells and sump pits get extra sealing at the edges. Split-level and walkout basements are the most common jobs around town.

03

Commercial Epoxy Flooring

Shops, offices and restaurants along Illinois Avenue and the Turnpike need floors that look sharp and survive heavy daily cleaning. Knoxville Epoxy Floor Pros installs chemical-resistant and decorative systems for these spaces, with nights and weekends available so doors can stay open while the floor goes down. Every commercial quote lists expected downtime in hours, not guesses. Decorative metallic floors suit salons and showrooms well.

04

Industrial Floor Coatings

Warehouses and fabrication shops in the Oak Ridge industrial parks deal with forklifts, pallet jacks and dropped parts every shift. High-build epoxy with a urethane topcoat resists abrasion and most shop chemicals, and painted aisle lines and safety zones can be added during the same install. Chemical spot tests are run first when a shop handles solvents or coolants. Thicker urethane cement is available for areas with hot washdowns.

05

Anti-Slip and Safety Finishes

Wet entries, taproom floors and loading docks need grip just as much as good looks. Aluminum oxide or polymer grit is mixed into the final coat, and the texture level is picked based on how often the floor gets wet and how easy it needs to be to mop. Ramps and steps can get a heavier texture than the rest of the floor. Samples with different grit levels are brought to every estimate.

AFTER THE INSTALL

Prep, Repairs and Floor Care in Oak Ridge

01

Moisture Testing and Diamond Grinding

Every slab gets a moisture reading before a single coat is mixed. Industrial diamond grinders then remove old sealers, paint and laitance, leaving a profile the base coat can grip, while attached vacuums keep dust out of homes and work areas. Skipping this step is the main reason cheap coatings peel. Dust-free grinding matters most in garages that open straight into a kitchen.

02

Crack, Pit and Spall Repair

Cracks, pits and spalled spots are filled before any color goes down. Hairline cracks get a flexible filler, while wider ones and forklift ruts are chased out and rebuilt with epoxy mortar. The finished floor looks smooth, and each repair is listed as its own line on the quote. Spalled steps into the house are rebuilt during the same visit.

03

Daily Cleaning and Upkeep

A dust mop and a damp mop with a pH-neutral cleaner handle most upkeep at home. Shops can use an auto scrubber with a mild degreaser. Skip bleach, acids and citrus cleaners since they dull the topcoat, and keep a mat at entry doors to catch winter grit. Oil drips and spilled paint wipe up easily when caught the same day.

04

Recoats and Touch-Ups

After years of cars, carts and tools, a light sanding and a fresh clear topcoat bring the shine back. Chipped spots are patched and blended in without redoing the whole floor. Knoxville Epoxy Floor Pros finishes most residential recoats in a single day. Many owners book a recoat every 7 to 10 years to keep floors looking new.

Get a Free Epoxy Floor Estimate in Oak Ridge, TN

An installer from Knoxville Epoxy Floor Pros will measure the space, test for moisture and bring flake, quartz and metallic samples to homes and businesses in Oak Ridge, Clinton and Oliver Springs. We also install epoxy floors in nearby Alcoa, TN.

Commercial clients get a written scope with downtime listed in hours, and every quote is emailed the same day. Call (555) 555-5555 or send the form to book a visit, including evenings and Saturdays.

WHAT HAPPENS AFTER YOU CALL

What to Expect From Our Crew

01 Free on-site estimate

Usually booked within 2 business days of your call.

02 Itemized written quote

Grinding, repairs, materials and labor are listed line by line.

03 Quick start dates

Most installs begin within 2 weeks of signing.

04 Furniture moving and cleanup

Both included, so the space is ready to use when the crew leaves.

05 Local to East Tennessee

Serving Knox, Blount, Anderson and Loudon counties.

Get a FREE Quote

Rated #1 Epoxy Floor Installer in Knoxville, 2026