Knoxville Epoxy Floor Pros builds industrial epoxy flooring for the plants and warehouses around Knoxville, TN where a floor failure means a stopped production line. An industrial system is poured thick, usually 20 to 40 mils of high-build resin, so it can take steel-wheeled carts, pallet jacks and forklifts turning on the same spot hundreds of times a shift. Every industrial floor can include:
So far in 2026 our crews have coated nearly 180,000 sq ft of plant and warehouse floor, including a fabrication shop in Forks of the River Industrial Park and a distribution center along Lovell Road. Most of that work happened during scheduled shutdowns, with zones phased so shipping never fully stopped.
Industrial systems typically run $5 to $12 per sq ft depending on build thickness, joint repairs and chemical exposure.
A distribution warehouse off Clinton Highway had forklift lanes worn down to bare concrete and control joints chipping apart under hard plastic wheels. We shot blasted the slab, filled every joint with semi-rigid polyurea and poured a 30 mil high-build epoxy in light gray with yellow aisle striping.
Crews worked in three zones over two weekends, so trucks kept loading at the far docks the whole time.
Cost: $97,200 for 18,000 sq ft
Timeframe: 6 overnight shifts over 2 weekends

A metal plating shop on Rutledge Pike was losing its old coating to acid splash around the dip tanks, and the bare concrete underneath had started to etch. Our crew cut out the damaged slab, rebuilt it with epoxy mortar and installed a novolac system with 6 inch coved curbs to hold any spill inside the tank area.
The shop booked the work during its July shutdown week and restarted the line right on schedule.
Cost: $26,400 for 2,200 sq ft
Timeframe: 5 days

An electronics assembly lab in Oak Ridge kept failing its static checks because the old vinyl tile had lost its conductive properties. We pulled the tile, ground off the adhesive and installed a static-dissipative epoxy over a grid of copper grounding strips tied into the building ground.
Every zone passed resistance testing before handoff, and the lab moved its benches back in the following Monday.
Cost: $34,200 for 3,600 sq ft
Timeframe: 4 days

INDUSTRIAL SYSTEMS WE INSTALL

01 · INDUSTRIAL SYSTEM
Forklift lanes and loading zones wear through thin coatings fast, so most plant floors start with a high-build or self-leveling system. High-build coats add 20 to 40 mils of thickness, while self-leveling pours flatten minor dips so carts roll smoother.
Build thickness is set zone by zone instead of one spec for the whole building. That saves money in quiet storage areas without shortchanging the aisles where loaded forklifts turn hundreds of times a shift.

02 · INDUSTRIAL SYSTEM
Battery charging rooms, wash bays and chemical storage areas need a coating that won't soften when acids or solvents sit on it. Novolac epoxy holds up to sulfuric acid, caustics and harsh cleaners far longer than standard epoxy ever could.
Knoxville Epoxy Floor Pros also coats secondary containment curbs and sumps, so spills stay exactly where the safety plan expects them. Those curbs are coved into the floor, leaving no seam for chemicals to creep under.

03 · INDUSTRIAL SYSTEM
Most industrial floor failures start underneath, which is why prep and repair get as much attention as the coating itself. Shot blasting or diamond grinding opens the slab to the right profile before anything goes down.
Control joints are filled with semi-rigid polyurea that flexes with the slab instead of cracking out. Spalled edges get rebuilt with epoxy mortar too, especially at dock plates and turns where forklift wheels hit hardest.

04 · INDUSTRIAL SYSTEM
Food processing, breweries and bottling lines deal with hot water washdowns, thermal shock and food acids every shift. Urethane cement goes down about a quarter inch thick and handles all of it without softening or lifting from the slab.
Integral cove bases and sloped drains keep water moving and leave no seams for bacteria to hide in. Most plant floors are installed in sections around production schedules so lines keep running.

05 · INDUSTRIAL SYSTEM
Electronics assembly, labs and data rooms need floors that bleed off static before it reaches sensitive parts. A conductive primer and static-dissipative epoxy are installed over copper grounding strips tied into the building ground.
Every zone is tested for resistance before handoff, with readings logged for your quality records. The finished floor is seamless and easy to clean, so it works well in clean rooms too.

06 · INDUSTRIAL SYSTEM
Clear aisle lines, forklift lanes and hazard zones help keep people and equipment apart on a busy plant floor. Lines are coated right into the epoxy system with durable urethane, so they hold up far longer than paint or tape.
Knoxville Epoxy Floor Pros can lay out walkways, pallet zones and OSHA color codes during the same install. Restriping on existing floors is also available when layouts change.
WHY PLANTS AND WAREHOUSES CHOOSE US
01
Installs are planned around your maintenance shutdowns and holiday closures, with zone maps that keep shipping lanes open.
02
Wet-film gauges are used throughout each pour, and the readings go into your closeout packet so you know the build matches the spec.
03
Safety data sheets for every product and a site-specific safety plan are sent to your plant manager before crews arrive.
04
Every aisle and joint is walked and checked with a loaded pallet jack before the floor goes back into service.
05
A crew lead certified as an ICRI Concrete Slab Moisture Testing Technician checks every slab before a coating system is chosen.
06
Every coating system carries a written limited warranty against peeling and delamination.
Most industrial floors we coat in Knoxville land between $5 and $12 per sq ft. A clean slab with a 20 mil build sits near the low end, while novolac containment areas, deep joint repairs or 40 mil self-leveling pours push it higher. Your written quote breaks out prep, repairs and coating so you can see where the money goes.
Usually, yes. We split the floor into zones and coat one while the rest keeps running, often over nights, weekends or a planned shutdown. Fast-cure primers and polyaspartic topcoats let a zone take foot traffic in about 12 hours and forklifts in about 48.
With normal forklift traffic, a properly prepped high-build system usually goes 10 to 15 years before it needs a recoat. Hard wheels in tight turns and dragged pallets wear it faster, so we often add an extra topcoat in those lanes.
Send the address, rough square footage, what runs on the floor and any chemicals it sees. We walk the slab, run a moisture test and check the joints, then send a written quote within 3 business days of the visit.
It doesn't have to be. We broadcast aluminum oxide or quartz into the topcoat in wet areas, ramps and wash bays, and the grit level is matched to how often the floor gets scrubbed so it stays easy to clean.
Run an auto scrubber with a pH-neutral cleaner and soft pads, and sweep up grit before wheels grind it in. Wipe chemical spills quickly, even on novolac, and give us a call for a recoat when the traffic lanes start to look dull.

WHAT HAPPENS AFTER YOU CALL
01 Free on-site estimate
Usually booked within 2 business days of your call.
02 Itemized written quote
Grinding, repairs, materials and labor are listed line by line.
03 Quick start dates
Most installs begin within 2 weeks of signing.
04 Furniture moving and cleanup
Both included, so the space is ready to use when the crew leaves.
05 Local to East Tennessee
Serving Knox, Blount, Anderson and Loudon counties.
Get a FREE Quote
Rated #1 Epoxy Floor Installer in Knoxville, 2026