Knoxville Epoxy Floor Pros coats garages, basements, patios and business floors in Hardin Valley, TN, and the crew lead for west Knox County lives just off Hardin Valley Road. Most homes here were built after 2000, so the slabs are newer but often troweled so smooth that a coating will not grip without a proper diamond grind. Every estimate is free and includes a moisture test, a crack check and color samples, and most jobs are booked within 10 days.
RECENT LOCAL PROJECTS

01
A family off Westcott Boulevard had a 2015 three-car garage with a glossy builder sealer that was peeling under hot tires. Knoxville Epoxy Floor Pros ground off the sealer, filled a few shrinkage cracks and broadcast a gray, black and white flake under a clear polyaspartic topcoat. All three bays were back in use the next morning, and the soccer gear now gets hosed off right on the floor. The owners say it was the easiest upgrade they have made since moving in.
Turnaround: 1 day
Price: $3,750 (690 sq ft)

02
A homeowner on Coward Mill Road turned one bay of a two-car garage into a home gym, but sweat and dropped plates were staining the bare concrete. The crew ground the slab, laid a gray flake epoxy system with a textured topcoat for grip, then set rubber tiles only under the squat rack. Cleanup now takes a quick mop after each workout. The owner later asked for the second bay to be coated to match.
Turnaround: 2 days
Price: $2,600 (400 sq ft)

03
A veterinary clinic on Hardin Valley Road needed exam room and kennel floors that could take daily disinfecting without staining or peeling. Old vinyl came up, the slab was ground and patched, and a seamless light gray flake epoxy went down with a cove base at the walls so nothing could hide in the corners. The clinic reopened on Monday after a weekend install. Staff say mopping the kennel area now takes half the time it used to.
Turnaround: 3 days over a weekend
Price: $9,800 (1,400 sq ft)
WHAT WE OFFER

01
Flake is the most requested garage finish in Hardin Valley because it hides dust, grips well underfoot and stands up to hot tires and road salt. Each floor gets a full diamond grind, a base coat, a full broadcast of colored chips and a clear topcoat that wipes clean with a damp mop.
Chip blends can be matched to brick, siding or garage cabinets, and samples are brought to every estimate so colors can be checked in real daylight. Most two-car garages in the newer neighborhoods off Hardin Valley Road are finished in a single day. Older slabs with oil stains get a degreasing pass before grinding.

02
Epoxy builds a thick, strong base that bonds deep into ground concrete, while polyaspartic cures much faster and holds its color in direct sun. Knoxville Epoxy Floor Pros often pairs the two, using epoxy underneath and polyaspartic on top, so the floor gets both strength and UV resistance.
That pairing matters for garages that stay open on long summer afternoons, since a plain epoxy topcoat can yellow over time. The final choice is made at the estimate based on how the garage is used and how fast it needs to be back in service. Both systems can include grit for extra traction on garage ramps.
MORE FLOOR SYSTEMS

01
Below-grade slabs can pull moisture from the soil, especially in homes near Beaver Creek and the low ground toward Solway. Every basement gets a moisture test first, then a vapor-blocking primer when readings run high, before any color goes on.
Solid color, quartz and metallic finishes all go over that base and turn cold concrete into a dry, bright room. Many Hardin Valley families use the finished space as a playroom, home office or teen hangout. Window wells and sump pits get extra sealing around the edges, and a dehumidifier helps the coating last even longer in damp months.

02
Covered patios and screened porches take rain, pollen and UV every day of the year. A polyaspartic system with a light texture keeps those floors from staining, adds grip when wet and holds its color in full sun.
Old paint and failing sealers are ground off first, and cracks are filled so the finished surface looks smooth. Most patio and porch jobs are done in 1 to 2 days, with outdoor furniture back in place by the weekend. Pool decks around newer Hardin Valley homes can get the same system with a cooler, lighter color.
03
Shops, offices and clinics along the Pellissippi Parkway corridor need floors that look clean and survive heavy daily cleaning. Knoxville Epoxy Floor Pros installs seamless solid color, flake and metallic systems for these spaces.
Work is scheduled around business hours, including nights and weekends, so doors can stay open. Every commercial quote lists expected downtime in hours, and cove bases can be added where floors are washed often. Clinics and salons often pick light gray or white finishes that make the space look brighter and cleaner.
04
Warehouses, labs and light manufacturing spaces in the Hardin Valley business parks deal with carts, pallet jacks and dropped tools. High-build epoxy with a urethane topcoat resists abrasion and most chemicals, and it stays easy to sweep.
Aisle lines, safety zones and loading areas can be painted during the same install. Larger floors are often split into sections over a few weekends so production never has to stop. Chemical spot tests are run first wherever solvents, coolants or lab cleaners are used on the floor. Overnight work is also available for spaces that run around the clock.
An installer from Knoxville Epoxy Floor Pros will measure the floor, test for moisture and bring flake, metallic and anti-slip samples to homes and businesses in Hardin Valley, Solway and Karns. We also install epoxy floors in nearby Louisville, TN.
A line-item quote is emailed the same day, and evening and Saturday visits are available. Businesses can book weekend installs so the work never interrupts a weekday. Call (555) 555-5555 or send the form to pick a time that works.

WHAT HAPPENS AFTER YOU CALL
01 Free on-site estimate
Usually booked within 2 business days of your call.
02 Itemized written quote
Grinding, repairs, materials and labor are listed line by line.
03 Quick start dates
Most installs begin within 2 weeks of signing.
04 Furniture moving and cleanup
Both included, so the space is ready to use when the crew leaves.
05 Local to East Tennessee
Serving Knox, Blount, Anderson and Loudon counties.
Get a FREE Quote
Rated #1 Epoxy Floor Installer in Knoxville, 2026