Knoxville Epoxy Floor Pros has handled epoxy floor repair on 72 failing floors that someone else installed, from peeling garage coatings off Emory Road to a gift shop floor in Pigeon Forge worn through by summer foot traffic. Most failures trace back to thin product, skipped grinding or moisture coming up through the slab, and each of those needs a different fix.
Homeowners along Asheville Highway and in Vestal usually call once a few chips turn into a peeling strip down the middle of the garage. A quick look tells whether a patch will blend in or the whole floor needs to come up, and that answer comes in writing before any grinder is turned on.

A homeowner in Kimberlin Heights had a big-box store epoxy kit lifting in sheets under both car tires after just two summers. We ground off the failed coating from 480 sq ft, ran a moisture test that came back clean and installed a 100% solids epoxy base with a polyaspartic topcoat that resists hot tire pickup.
The cars were parked back inside on day three, on a floor rated for hot tires straight off the highway.
Cost: $2,880 for 480 sq ft
Timeframe: 3 days

An outfitter shop in Townsend had dozens of chips and gouges where kayaks and gear carts had been dragged across a 10-year-old epoxy floor. Knoxville Epoxy Floor Pros cut out the damaged spots, filled them with epoxy mortar, then sanded the whole 1,400 sq ft and rolled on a fresh color coat and topcoat.
Work was done on two weekdays before the spring paddling season, so the shop never lost a busy weekend.
Cost: $5,600 for 1,400 sq ft
Timeframe: 2 days

A parts plant in Kingston had epoxy delaminating across a 2,200 sq ft packing area where water seeped up through an old slab with no vapor barrier. The crew shot-blasted down to sound concrete, applied a moisture vapor barrier primer and rebuilt the floor with a high-build epoxy and a urethane topcoat.
The packing line moved to a neighboring bay for the week, so shipments still went out on schedule.
Cost: $13,200 for 2,200 sq ft
Timeframe: 4 days
REPAIR SERVICES WE OFFER
01 · REPAIR SERVICE
Peeling usually starts at a garage door edge or under tire paths, while bubbles point to moisture or outgassing from the slab. Finding the cause comes first, because a patch over a wet slab will lift again within a season.
Loose coating is ground off until the edges are firmly bonded. A moisture barrier primer goes down where needed, then the new layers are feathered into the sound areas.
02 · REPAIR SERVICE
Small chips from dropped tools and cracks along control joints are the most common calls. Each damaged spot is cut back to a clean edge and filled with epoxy mortar or a flexible polyurea joint filler.
Worn traffic lanes get a light sanding and a fresh topcoat over the whole floor, so the repair blends in. Flakes and color are matched as closely as the original allows.
03 · REPAIR SERVICE
Forklift ruts, chemical burns and failed coatings around drains can shut down part of a shop if they spread. Repairs are scheduled in sections, often on nights or weekends, so production keeps moving.
Fast-cure repair mortars let traffic back on damaged areas within hours. When a floor is failing across most of its area, a full grind and recoat usually costs less than chasing patches.
04 · REPAIR SERVICE
A floor that has lost its shine or picked up scuffs and light stains often just needs a new topcoat. When the base layers are still well bonded, the surface is screened, cleaned and finished with a fresh urethane or polyaspartic coat.
Recoating costs far less than a full replacement and is usually done in a single day. It also resets the clock on wear, so a busy garage or shop floor can go years before it needs attention again.
05 · REPAIR SERVICE
Control joints and spalled edges are where most coatings start to break down, especially under forklifts or car tires. Damaged joints are cut clean and refilled with a semi-rigid polyurea that flexes with the slab instead of cracking.
Spalled spots get rebuilt with epoxy mortar and ground flush before any color goes back on top. The repaired areas are blended into the existing floor, so the fix is hard to pick out once the coating cures.
06 · REPAIR SERVICE
Moisture pushing up through the slab is one of the top reasons coatings bubble and lift, and patching over it only buys a few months. The failed coating comes off, the slab is tested with in-slab RH probes and a moisture-tolerant epoxy primer goes down first.
Knoxville Epoxy Floor Pros then rebuilds the floor on top of that barrier, so the new system stays bonded even in damp basements and older garages. The test readings are shared with you before any work is quoted.
01
Pull tests and moisture readings explain why the coating failed, so the fix targets the real problem.
02
Photos of the damage come with a written note on whether a spot repair or a full recoat makes more sense.
03
Small test patches are mixed and checked against the old floor in daylight before the repair is finished.
04
Repaired areas carry the same written warranty terms as a brand new install.
05
A crew lead certified as an ICRI Concrete Slab Moisture Testing Technician checks every slab before a coating system is chosen.
06
The person who measures your floor works on the crew that grinds it, so the same faces stay from the first visit to the final walkthrough.
Sometimes. If the peeling is limited to one area and the rest of the coating passes a pull test, that section can be ground out and patched. Widespread peeling usually means a full recoat.
Bubbles usually come from moisture vapor or air escaping the concrete while the coating cured. A moisture test shows which one, and a vapor barrier primer solves most cases.
Close, but rarely perfect on an older floor that has faded. A fresh topcoat across the whole surface is the best way to make repairs disappear.
Spot repairs start around $350, and full grind-and-recoat jobs run about $3 to $6 per sq ft depending on how much coating has to come off.
Yes, most repair calls are for floors someone else put down. The first step is figuring out what product was used and why it failed.

WHAT HAPPENS AFTER YOU CALL
01 Free on-site estimate
Usually booked within 2 business days of your call.
02 Itemized written quote
Grinding, repairs, materials and labor are listed line by line.
03 Quick start dates
Most installs begin within 2 weeks of signing.
04 Furniture moving and cleanup
Both included, so the space is ready to use when the crew leaves.
05 Local to East Tennessee
Serving Knox, Blount, Anderson and Loudon counties.
Get a FREE Quote
Rated #1 Epoxy Floor Installer in Knoxville, 2026